New Local Plan

Search representations

Results for Trenitalia c2c Ltd search

New search New search

Comment

New Local Plan

6. How best do you think we can improve the transport system serving Southend

Representation ID: 3910

Received: 27/03/2019

Respondent: Trenitalia c2c Ltd

Representation Summary:

Pleased to see Council recognises need for economic and housing growth and transport infrastructure investment. Supporting the railway Infrastructure in particular is vital, given the unique economic and environmental benefits it provides that cannot be delivered by investment in roads. For example, only the railway provides a realistic link to central London and Canary Wharf for regular commuters, who then spend their salaries locally, bringing economic growth. The railway also provides the most environmentally-friendly form of transport for longer journeys, which will be vital for protecting local air quality.

Comment

New Local Plan

1.4 How should Southend develop in the future in seeking to deliver 18,000 - 24,000 new homes and 10,000 - 12,000 new jobs, please select from one of the options stating your reasoning.

Representation ID: 3911

Received: 27/03/2019

Respondent: Trenitalia c2c Ltd

Representation Summary:

Given the latest projected housing numbers reported by each local authority in the region, C2C latest analysis forecasts that our contractualised route capacity, including the additional rolling stock scheduled for 2021, will be exhausted by 2025. This means the projected scale of housebuilding included in Southend's Local Plan. And in the other equivalent documents from local authorities in the region, is at risk. Network Rail is undertaking a route study to evaluate our forecasts, and the potential solutions, which is due to report in late 2019.

Support

New Local Plan

1.4 How should Southend develop in the future in seeking to deliver 18,000 - 24,000 new homes and 10,000 - 12,000 new jobs, please select from one of the options stating your reasoning.

Representation ID: 3912

Received: 27/03/2019

Respondent: Trenitalia c2c Ltd

Representation Summary:

c2c strongly supports the importance of continued economic growth and the provision of more homes, both in Southend borough and the wider region. The combination of comparatively low housing costs, easy access to and from central London, and the most punctual commuter rail service in the South East are important factors that underpin this growth.

Comment

New Local Plan

6. How best do you think we can improve the transport system serving Southend

Representation ID: 3913

Received: 27/03/2019

Respondent: Trenitalia c2c Ltd

Representation Summary:

Trenitalia c2c Ltd holds a 15-year franchise for the Essex Thameside operation until November 2029. The length of this contract means we have an ongoing interest in the medium- to long-term growth and development of Southend borough and the wider south Essex and east London region. A 20% increase in seats is planned across C2C fleet in December 2021 (accelerated from original agreement of 2022-2024, to recognise scale of growth already delivered on franchise). No further increases planned.
Signalling replacement is deferred until 2040, with limited capacity for further rolling stock and lengthened trains, and already operating at maximum capacity for signalling system at peak times. Given the latest projected housing numbers reported by each local authority in the region, our latest analysis forecasts that our contractualised route capacity, including the additional rolling stock scheduled for 2021, will be exhausted by 2025. This means the projected scale of housebuilding included in Southend's Local Plan. And in the other equivalent documents from local authorities in the region, is at risk. Network Rail is undertaking a route study to evaluate our forecasts, and the potential solutions, which is due to report in late 2019.
Trenitalia UK (c2c parent company) is developing an Outline Business Case for DfT for investment in ETCS Level 2 (train-based signalling that would replace current traffic light signals). This, plus 12 additional units has the potential to provide 28 trains per hour and would provide sufficient additional capacity across the route. SBC should support this scheme and include within any Growth Deal – the capital costs of the scheme should also require contributions from developers
We urge Southend Borough Council to support the inclusion of our scheme in this strategy (the LP), and identify funding sources across the region that can be used to contribute to the capital and net operating costs of the proposal.
This would provide sufficient additional capacity across the route. It would also enable better separation between fast and stopping trains, and therefore faster journey times between Southend and London.

Comment

New Local Plan

6. How best do you think we can improve the transport system serving Southend

Representation ID: 3914

Received: 27/03/2019

Respondent: Trenitalia c2c Ltd

Representation Summary:

To deliver this economic growth and the proposed housebuilding programme, maintaining and improving the transport infrastructure is absolutely essential. We are pleased to see the Council recognises it as such in its Plan. Supporting the railway Infrastructure in particular Is vital, given the unique economic and environmental benefits it provides that cannot be delivered by investment in roads. The railway also provides the most environmentally-friendly form of transport for longer journeys, which will be vital for protecting local air quality.

Comment

New Local Plan

6. How best do you think we can improve the transport system serving Southend

Representation ID: 3915

Received: 27/03/2019

Respondent: Trenitalia c2c Ltd

Representation Summary:

The C2C route capacity is set to be exhausted by 2025because:
• At peak times we are currently operating at the maximum capacity for the signalling system of 20 trains per hour. That means we cannot increase the frequency of service
• Our options for further increasing capacity by adding rolling stock and lengthening trains are limited. Many peak services are already operating at the maximum length of 12-carriages. Additional 12-car trains could also create problems at London stations and thereby increase delays route wide
• The replacement of the current signalling system is expensive and has been deferred to 2040. This will result in an ongoing decline in the reliability of the signalling infrastructure until that point

Comment

New Local Plan

6. How best do you think we can improve the transport system serving Southend

Representation ID: 3916

Received: 27/03/2019

Respondent: Trenitalia c2c Ltd

Representation Summary:

Accessibility in and around stations
• A Masterplan developed for Southend Central station that would support the Council’s regeneration objectives for the High Street but works currently unfunded so would require support from SBC for it to be deliverable.
• Access improvement required at Chalkwell Station (both platforms) but works not likely to be completed until towards end of franchise (2029). Support from SBC to access funds from national sources or developers would help deliver this sooner.
• Southend East station is inaccessible for passengers arriving from London. We have received indication that this will qualify for support from the Department for Transport's Access for All fund. However if this funding is not forthcoming, it too would benefit from Council support.
• Improved pedestrian environment around Westcliff and Southend East stations required.