Southend Central Area Action Plan

Search representations

Results for Burges Estate Residents Association search

New search New search

Comment

Southend Central Area Action Plan

Are there further opportunities which could be explored and developed through this Area Action Plan?

Representation ID: 748

Received: 10/08/2010

Respondent: Burges Estate Residents Association

Representation Summary:

1. Page 14/15. It is difficult to envisage Southend town centre as a major retail centre. The advent of Lakeside and Blue Water has sealed Southend's fate as a retail centre of choice for durable goods. This is unlikely to be reversed with Southend's anti-car transport policy, the cheap end shops catering for day trippers and the failure of the multi nationals to expand their ranges upwards. Perhaps it is only as a niche type shopping environment as the document suggests that the centre can survive. But the addition as proposed of more bulky food shops is not my idea of how the centre should perform nor in my opinion will it "enhance the town centre's appeal to the catchment population or visitors further afield".

Comment

Southend Central Area Action Plan

Have we correctly identified the key challenges to be addressed by the Area Action Plan?

Representation ID: 749

Received: 10/08/2010

Respondent: Burges Estate Residents Association

Representation Summary:

Page 17. Para 3.24 makes passing reference to a new library. Where is this to be? What is wrong with the existing one? Is this a serious proposition?

Comment

Southend Central Area Action Plan

Are there further opportunities which could be explored and developed through this Area Action Plan?

Representation ID: 750

Received: 10/08/2010

Respondent: Burges Estate Residents Association

Representation Summary:

Page 19. The summary of opportunities and constraints misses one major constraint and challenge and that is the inability or lack of resources to maintain that which exists. In the context of opportunities to enhance the High Street, improve landscaping, indeed a whole range of public infrastructure works, Southend is incapable of basic maintenance. Have a look at the new works to the seafront from the pier to the Kursaal. Already the new paving is stained, dirty and unattractive. The base of the pier bridge has weeds growing. Even the High Street paving is scruffy. There is no point in pursuing these opportunities for improvement unless and until the Council is able to demonstrate it has the resources and inclination to fund the whole life costs of projects.

Comment

Southend Central Area Action Plan

Are there further opportunities which could be explored and developed through this Area Action Plan?

Representation ID: 751

Received: 10/08/2010

Respondent: Burges Estate Residents Association

Representation Summary:

Page 22 para 1. Whereas we need a wider range of shops to sustain Southend as a regional centre, I do not equate that with requiring more shopping floor space overall. The internet is taking its toll on High Streets and Southend is struggling to fill what is currently available.

Comment

Southend Central Area Action Plan

Do you agree that the Evaluation Criteria set out above are the right ones to test the overarching Spatial Options?

Representation ID: 752

Received: 10/08/2010

Respondent: Burges Estate Residents Association

Representation Summary:

para 8 seeks to make town centre living more appealing to families. That is always going to be difficult on a variety of levels. The noise, the lack of parking, the likely absence of homes with adequate private amenity space. This against a backdrop of wishing to increase the centre's vibrancy (i.e., noise).

Comment

Southend Central Area Action Plan

Have we correctly identified the key challenges to be addressed by the Area Action Plan?

Representation ID: 753

Received: 10/08/2010

Respondent: Burges Estate Residents Association

Representation Summary:

Page 25 et al. The three options as set out are not mutually exclusive but can be seen, especially in the current economic situation, as short, medium and long terms options and are therefore supportable.

Comment

Southend Central Area Action Plan

Will the above Strategy for development, urban design and built form deliver the concept of the City by the Sea?

Representation ID: 754

Received: 10/08/2010

Respondent: Burges Estate Residents Association

Representation Summary:

Page 35. Although in many respects the concept can be supported, there seems an obsession in trying to achieve links between the town centre and the seafront. Aside from day trippers it would useful to know whether you have survey information that large numbers of residents actually combine activities that feature both locations in a single trip. My experience is they do not.

Comment

Southend Central Area Action Plan

7a Allow the amount of office space to significantly reduce, in favour of a more residential community

Representation ID: 755

Received: 10/08/2010

Respondent: Burges Estate Residents Association

Representation Summary:

Page 39. The leading land use identified is workspace. This expression is used to indicate small scale activities of a craft nature for example. I cannot believe it is intended not to retain or at least encourage some office development to remain albeit in a form which is sustainable in terms of its potential uses. I do not think this point is made sufficiently clear.

Comment

Southend Central Area Action Plan

9a Concentrate retail activity in the northern/southern sections of High Street (in & around The Victorias & The Royals shopping centres) with cafes,bars,restaurants,banks & building societies & smaller scale retail uses in the central part of High Street

Representation ID: 756

Received: 10/08/2010

Respondent: Burges Estate Residents Association

Representation Summary:

Page 43.The High Street paving is not heavily patterned. What it is, is a disgrace! Poorly executed (not reasonably well) and poorly maintained subsequently. The materials used for the paving have lives of up to 30 years. It cannot be justified in spending money after just 7 years. Get the joints done between the granite setts, get a jet spray to clean the paving, rip out the weeds growing under the seats and continue with a proper maintenance schedule. It is noticeable that the new paving laid in front of the amusement arcades along the seafront is already heavily stained with food and drink and heaven knows what else. The High Street is a retail centre. People are concerned about the quality of the shops. Yes they care about the shopping environment and preferably an all weather experience but otherwise provided the paving under foot is level, even and clean, I don't think it is a major issue in peoples minds especially after five minutes it looks a mess! As for the proposal to increase the presence of motor vehicles the document does not make clear why this should occur. The idea of providing passive surveillance seems somewhat specious. So far as the options are concerned, the first of concentrating the retail activity in the two extremes is broadly the situation which is prevailing today. The danger is of the centre splitting in two.

Comment

Southend Central Area Action Plan

Alternative options were considered during the preparation of both the Central Area Masterplan and the development brief described above. Given the status of the development brief it is no longer appropriate to consider alternative options.

Representation ID: 757

Received: 10/08/2010

Respondent: Burges Estate Residents Association

Representation Summary:

Page 49. It makes sense to see this area become the focus for education especially with the loss of half the multi-storey car park. However I am a little surprised to see mention of a library. Can it be? the current library in Victoria Ave. is outmoded, no longer viable? Surely it cannot be considered for replacement only on the basis of being a few hundred yards up the road? No justification is given for the replacement and on that basis it cannot be supported and in the context of severe restraint on public expenditure this issue needs to be rethought even in the longer term.

For instructions on how to use the system and make comments, please see our help guide.