Appendix 6: Dwelling Figures for the Central Area – relationship with Core Strategy Requirements


Core Strategy 2001 to 2021

Completed April 2001 to March 2016 (net)

Core Strategy (as adjusted 2016 to 2021)

Site Allocations (net) to be delivered by 2021*

Other commitments to be delivered by 2021

Total New Dwellings

Difference from Core Strategy (adjusted 2014 to 2021)

SCAAP

2,474

1,087

1,387

1,732

425

2,157

+770

Local Authority Area excluding SCAAP

4,026

3,694

332

To be determined

780

780

+448

All Borough (Total)

6,500

4,781

1,719

1,732

1,205

2,937

+1,218

*In relation to the amount of dwellings to be delivered via Opportunity sites within the SCAAP area by 2021 the following assumptions have been made:

- Queensway (PA4.1): half of the site is assumed to be delivered by 2021

- Victoria avenue (PA8.1): sites with planning permission assumed to be delivered by 2021

- Baxter Avenue (PA8.2): half of the site is assumed to be delivered by 2021

- Sutton Road (PA9.1): sites with planning permission assumed to be delivered by 2021