Rights of Way Improvement Plan (ROWIP)

Ended on the 6 March 2009
For instructions on how to use the system and make comments, please see our help guide.

(2) 3. The Network


Southend-on-Sea has approximately 47km of PRoW recorded on the Definitive Map and Statement (DMS). The PRoW are varied in length with the majority of routes being short sections located within the urban area with a small number of longer sections located within semi-rural areas.

In addition there is one circular route (the Millenium Walk) promoted by the Ramblers Association which combines several PRoW with some roadside sections.

The categories of PROW recorded on the DMS are listed below:

  • Byways open to all Traffic - Boat
    A byway open to all traffic is a carriageway over which the PRoW enables vehicular traffic but one which is used primarily for the purposes for which footpaths and bridleways are used i.e on foot and on horseback.
    • there are 6 byways recorded on the DMS
    • approximate distance of 1.1km
    • they make up 2% of the network.
    Note: Whilst still indicated on the DMS, 1 byway, (a length of 84m) has been formerly adopted and is therefore maintained as part of the road network*.

  • Bridleways
    A bridleway is a way over which the PRoW is on foot and on horseback, leading a horse and possibly with an additional right to drive animals.
    • There are 3 bridleways recorded on the DMS,
    • approximate distance of 1.0km
    • they make up 2% of the network;

  • Footpaths
    A public footpath is a way over which the PRoW is on foot only
    • There are 245 footpaths recorded on the DMS,
    • approximate distance of 44.9km,
    • they makes up 96% of the network.
    Note: Whilst still indicated on the DMS there are approximately 19km of footpaths which have been formally adopted as part of the road/footway network and are now maintained as part of the road network*.
*It is possible that amendments to the DMS may be required due to the subsequent adoption of some byways and footpaths as part of the road network since the original DMS was published. This will require consultation with user groups.

Chart 1: Percentage of PROW

Chart 1

Whilst the Borough is well served with public footpaths, it is recognised that there are a limited number of bridleways. There are permissive routes available for horse riders, but due to the urban nature of the area, the creation of additional routes is challenging. This is discussed further in Section 6 (Evaluation).

A number of permissive footpaths exist which are not recorded on the DMS. This gives rise to the presumption that there are gaps within the formal network.

There are a number of designated cycle routes which are linked viathe road network. More routes are proposed through the Local Transport Plan (LTP2) and the strategy is discussed in Section 7.

See Appendix 2 for the map of cycle routes within the Borough of Southend-on-Sea.

For instructions on how to use the system and make comments, please see our help guide.
back to top back to top