Core Strategy - Adopted December 2007

For instructions on how to use the system and make comments, please see our help guide.

Southend Context

Introducing Southend

0.1 In 2001 the Government recognised the importance of the Southend area to the Thames Gateway by including the entire Borough within its extended boundaries. The Thames Gateway is the Government's national and regional priority for regeneration and growth as set out in the current Regional Spatial Strategy (Regional Planning Guidance for the South East (RPG 9, 2001)). These provisions are reinforced in the Government's Sustainable Communities Plan of 2003[1].

0.2 The Thames Gateway extends from East London to Southend on the north bank of the River Thames and Sheerness in Kent to the south of the River. That part of Thames Gateway located in South Essex lies within the East of England region (see Map 1).

0.3 Significant progress has been made in working towards the key objective for the Essex Thames Gateway (ETG)[2] sub-region of achieving regeneration through jobs-led growth, higher levels of economic performance and employment, and a more sustainable balance of local jobs and workers. Complementary Zones of Change[3] have been identified as the catalyst for delivery of the vision, Southend being identified as the 'cultural and intellectual hub and a higher education centre of excellence.'

Sustainable Development: development which meets our current needs without wasting natural resources or spoiling the environment for future generations.

(Our Common Future: The World Commission on the Environment and Development - Bruntland Report 1987)

0.4 Progress has included the establishment of key delivery mechanisms, notably the Urban Regeneration Company for Southend - "Renaissance Southend Limited" and the Thames Gateway South Essex Partnership together with its related Transport Delivery Board, and the completion of a number of major public sector led projects including:

  1. a new college/university campus and public realm improvements in the town centre;
  2. remodelled Pier Hill improving links with the seafront and including award winning architecture;
  3. development of former Ministry of Defence land at Shoeburyness; and



  1. improved operational facilities at London Southend Airport placing it in a position to develop its potential to function as a local regional airport and to maximise the opportunities presented by the Olympic site in East London.

0.5 The Urban Regeneration Company is one of a number of such companies established in key towns and cities in the Country to promote and deliver regeneration and growth as part of the Government's Sustainable Communities Plan Agenda.

Urban Renaissance: action that secures significant improvement to the vitality and environment of urban areas so that they are more attractive places in which to live, work, shop and spend time.

0.6 These changes have brought benefits to the locality and the region and represent a first step in working towards addressing a number of acute economic, housing and transportation problems that have historically affected Southend namely:

  1. sustained high unemployment;
  2. pockets of severe deprivation;
  3. lack of affordable housing;
  4. low educational attainment and skill levels;
  5. an imbalance between workers and jobs; and
  6. poor accessibility and the worst road traffic congestion of anywhere in Essex.

0.7 Private sector investment will now represent the next phase of regeneration and growth in the town. However, this will not be achieved without continued Government support in policy and financial terms and the establishment of a clear up-to-date planning framework to guide potential developers and to maximise the regeneration opportunities offered by the town.

0.8 The challenge facing Southend on Sea Borough Council (hereafter referred to as 'the Council') over the next two decades will be to maintain the momentum of change whilst ensuring that it is achieved in a planned and balanced manner and respects the local environment to deliver jobs led sustainable regeneration and growth. Key to this will be the delivery of the infrastructure necessary to support the provision of new jobs and housing, particularly transport infrastructure.

0.9 Transport studies[4] have clearly illustrated that the scale of the transportation problems in TGSE is such that demand management alone will not solve the problems and there is no escaping the need for significant investment in transport infrastructure and services to deliver a 'step change' in provision.

0.10 Without improvements to the infrastructure the Government's objectives for regeneration and growth as set out in its Sustainable Communities Plan will not be met.


Table 1: Key Characteristics of Southend (see also Southend Annual Monitoring Report)

Characteristics

Related Policy and Survey Documents /Comments

Local Government

  • Unitary Authority responsible for land use planning, transport / highway matters, minerals and waste planning
  • No Parish Councils
  • One Town Council (Leigh Town Council)

Character/

Population

  • 160,000 residents*
  • catchment population of 325,000
  • land area of 4,163 hectares
  • densely developed urban area
  • Mid year population estimate 2004
  • Second highest population density in East of England Region

Role

  • Regional/Sub Regional office, shopping, leisure and cultural centre
  • Major tourist destination with 6.1 million day visitors per year
  • Second most popular day resort in UK

Economy

  • 65,500 jobs
  • some 5,000 companies
  • over 280,000 m of office floorspace centred on town centre
  • some 100 hectares of industrial land on 10 key estates
  • unemployment rate of 3.1% (January 2006)
  • imbalance between number of workers and available jobs
  • 8th most deprived area in region
  • eastern part of town has Objective 2 European funding status
  • Inter-Departmental Business Register - ONS 2005
  • 80% of companies employ 10 persons or less
  • East of England 1.7% England/Wales 2.6%
  • Net daily outflow of 6,900 persons in 2001 (census)
  • Index of Multiple Deprivation - ONS (2004)

Retail

  • Southend Town Centre - Major Retail Centre (102,000 m of ground floor floorspace)
  • District centres at Westcliff (Hamlet Court Road); Leigh;
  • Local centres at Southchurch, Thorpe Bay, Eastwood and Shoebury (Ness Road/West Road)
  • 3 out of centre Retail Parks at Airport; Greyhound (Sutton Road) and London Road
  • Draft East of England Plan[11] (Policy E5)
  • Southend on Sea Retail Study(2003)

Built / Natural

Environment

  • Some outstanding examples of Victorian, Edwardian and modern architecture
  • 695 sites recorded in the Southend Sites and Monuments Record
  • 8.5 miles of accessible foreshore
  • 500 hectares of mature parks, woodlands and gardens
  • since 2001 all development has been on previously developed land
  • limited countryside separating Southend from nearby settlements
  • 14 Conservation Areas; 1,659 Listed Buildings and 4 Scheduled Ancient Monuments
  • protected by national and international nature conservation/biodiversity designations
  • Study of Open Space and Recreation (2004)
  • Draft East of England Plan (Policy SS9)
  • Majority designated Green Belt (2 adjoining Country Parks)

Housing

  • Nearly 71,000 households (35% one person households)

    - 73% owner occupied

    - 8% Local Authority Renting

    - 13% Private Renting

    - less than 4% Housing Association/Social Landlord Renting

  • Average Household Size 2.2 persons
  • 92% of dwellings built at densities of over 50 dwellings per hectare
  • Significant increase in affordable houses required to 2021
  • 2001 Census
  • East of England 73% England/ Wales 69%

    12% 13%

    11% 9%

    5% 6%

    2.37 2.36

  • Borough Council development records 2004/5
  • Housing Needs Study - Fordhams (2004)

Transport

  • major east-west transport corridor to London (40 miles), comprising;

    - strategic highway corridors/A127/A1159

    - two railway lines London Fenchurch Street to Shoeburyness (c2c Rail) and London Liverpool Street to Southend Victoria (One Rail)

    - River Thames Corridor

  • 9 railway stations serving Southend. Further station planned at London Southend Airport
  • London Southend Regional Airport - identified in Government Aviation White Paper (December 2003) as having long term potential to cater for 2 million passengers per annum. Identified as a Major Airport in East of England Plan
  • Congestion on highway corridors causing delays and affecting local economy
  • Key sections operating at or close to capacity
  • Regeneration opportunities inhibited due to poor access
  • No Trunk Roads in Borough
  • Draft East of England Plan A127/A1159 part of Strategic Road Network (Policy T7)
  • Rail lines - part of Trans European Transport Network (TEN-T)
  • Draft East of England Plan - Southend identified as Regional Transport Node (Policies SS6 and T5)
  • London Southend Airport Masterplan - Regional Airports Limited (July 2005).
  • Draft East of England Plan (Policy E8 and T12 and Key Diagram)
  • London to Southend Movement Study (LOTS) Hyder Consulting Ltd. for Thames Gateway South Essex Partners (May 2004) - study recommended by RPG 9. Study identifies need for 'step change' in transport infrastructure provision

Regeneration

  • Southend designated as part of Thames Gateway - National and Regional Priority for regeneration and growth
  • Identified as 'cultural and intellectual hub and higher education centre of excellence'
  • Identified as 'Key Centre for Development and Change' and Priority Area for Regeneration
  • Regional Planning Guidance for the South East (RPG 9) March 2001
  • Creating Sustainable Communities: Making it Happen: Thames Gateway and the Growth Areas - ODPM 2003
  • Draft East of England Plan(Policies SS3, SS5 and ETG4))

Planned Growth

  • Jobs led growth to reduce imbalance between workers and local jobs
  • 13,000 additional jobs by 2021;
  • 6,500 additional dwellings by 2021
  • Draft East of England Plan

    - (Policies E1 and ETG5)

    - (Policies H1 and ETG1)

Delivery Vehicles

  • Thames Gateway South Essex (TGSE) Partnership

    - TGSE Transportation Delivery Board (Thurrock and Southend Borough Council's and Essex County Council)

  • 'Renaissance Southend Limited' - Urban Regeneration Company
  • TGSE Economic Baseline Study
  • TGSE Business Plan for Transport (November 2005)
  • RSL Business Plan 2005 - 2008

*Note: Resident Population - ONS population estimates remain significantly out of step with population counts based on other sources eg residents registered with GP's was 175,240 in 2002.

Core Strategy Development Plan Document

0.11 The preparation of this Core Strategy Development Plan Document (DPD) represents the first stage in preparing such a comprehensive land use planning framework for the Borough of Southend on Sea as a whole (hereafter referred to as 'Southend'). Once adopted it will replace elements of the current Borough Local Plan that was adopted in 1994.

0.12 This Core Strategy does not include a review of those policies of the adopted Essex and Southend on Sea Waste Local Plan that refer to Southend on Sea. The latter plan covers the period to 2010. The Borough Council will prepare a Waste Core Strategy to review that plan for the post 2010 period. It will be amplified in the Council's Criteria Based Policies and Site Allocations DPD. In the meantime it is considered that the relevant policies of the adopted Waste Local Plan remain appropriate to the needs of the Borough.

0.13 The Core Strategy is required to be prepared in accordance with national planning policy guidance[5] and the regional spatial strategy (RSS), currently Regional Planning Guidance for the South East (RPG 9). A revised RSS is now at an advanced stage of preparation, and the emerging 'East of England Plan' (Regional Spatial Strategy for the East of England) will, once adopted, replace RPG 9. The adopted and emerging regional spatial strategies fully endorse the objectives of Essex Thames Gateway and set out strategic policies for the regeneration of the area, including specific targets for additional jobs and dwellings in Southend.

0.14 The Core Strategy also needs to take into account, and inform the preparation/revision of, other related plans and documents to ensure an integrated approach to regeneration. These include the Southend on Sea Local Transport Plan and Southend's Community Plan (see Diagram 1).

0.15 The Core Strategy provides the vision, objectives and broad strategy for the spatial development of Southend. This includes the distribution of a 10-year housing supply; and sets out key policies against which all planning applications will be assessed, including the Council's core policies on minerals and the protection and enhancement of the natural and historic environment (including conservation areas).

0.16 Following public consultation in accordance with statutory procedures and an Examination of the Plans policies and proposals, including a hearing before an independent inspector, the Core Strategy was adopted by the Borough Council on 13th December 2007.



0.17 Sustainability Appraisal Report and Appropriate Assessment (prepared by Baker Associates on behalf of the Council) accompanies the Core Strategy,detailing the social, economic and environmental impact of the proposals.

0.18 Further Development Plan Documents (DPD's) and Supplementary Planning Documents (SPD's) will be prepared in due course within the framework of the Core Strategy to provide for more detailed site-specific policies and development guidance. These plans will be prepared in accordance with the timetable for plan production as set out in the Council's Local Development Scheme (LDS). Once completed the documents will make up a comprehensive Local Development Framework (LDF) for Southend that will replace the current Borough Local Plan in its entirety. Progress in implementing the provisions of these plans (collectively known as local development documents) will be monitored by means of an Annual Monitoring Report (AMR) and changes will be made to appropriate plans if deemed necessary.

0.19 Table 2 illustrates the existing and emerging replacement planning policy framework whilst Diagram 2 shows the documents that will comprise the Southend Local Development Framework.

0.20 The Core Strategy has been informed by a number of supporting documents commissioned by the Council, 'Renaissance Southend' or the Thames Gateway South Essex Partnership. These will in turn inform the preparation of further DPD's and SPD's. The supporting documents are as follows:

Southend Studies

  1. Housing Needs Survey (Fordham Research, May 2003)
  2. Town Centre Study and Master Plan Framework (Buro Happold, August 2003)
  3. Urban Capacity Study (Atkins, August 2003)
  4. Retail Study (CB Richard Ellis, September 2003)
  5. Hosing Needs Survey Update (Fordham Research, April 2004)
  6. A Study of Open Space and Recreation (Leisure and the Environment, August 2004)
  7. A Study of Playing Pitches (Leisure and the Environment, August 2004)
  8. Industrial Estates Study (GVA Grimley, July 2005)
  9. Commercial Seafront - Regeneration Principles (EDAW, October 2005)

Essex Thames Gateway

  1. London to Southend Movement Study (LOTS) - (Hyder Consulting, May 2004)

Table 2: Adopted and Emerging Replacement Statutory Planning Policy Framework

Existing Adopted Policy Framework

Emerging Replacement Policy Framework

Regional

Regional Planning Guidance for the South East (RPG 9)

(Government Office for the South East, Government Office East of England and Government Office for London)

Adopted March 2001

Plan period to 2016

Draft East of England Plan (Regional Spatial Strategy)

(East of England Regional Assembly)

Plan period to 2021

Examination in Public Report of Panel June 2006

Secretary of State Proposed Changes December 2006

currently in the course of preparation

County

Essex and Southend on Sea Replacement Structure Plan (Essex County Council and Southend on Sea Borough Council)

Adopted April 2001

Plan period to 2011

Structure Plan to be replaced by East of England Plan once adopted

Essex and Southend on Sea Waste Local Plan (Essex County Council and Southend on Sea Borough Council)

Adopted September 2001

Plan period to 2010

Southend Waste Core Strategy

Southend Development Plan Document (DPD 6): Criteria Based Policies and Site Allocations

(Southend on Sea Borough Council)

to be prepared

Plan period to 2021

Minerals Local Plan (Essex County Council)

Adopted January 1997

Plan period to 2004

Southend Core Strategy Development Plan Document (DPD1)

(Southend on Sea Borough Council)

replaces Minerals Local Plan with the exception of that part of the designated Minerals Consultation Area for Brickearth lying within the Southend Borough*

Southend Development Plan Document (DPD 6): Criteria Based Policies and Site Allocations

(Southend on Sea Borough Council)

to be prepared

will replace the Minerals Local Plan designated Minerals Consultation Area for Brickearth policies once adopted

Plan period to 2021

Local

Southend on Sea Borough Local Plan

(Southend on Sea Borough Council)

Adopted March 1994

Plan period to 2001

Southend Core Strategy Development Plan Document (DPD1) (Southend on Sea Borough Council)

replaces a number of key policies within the Borough Local Plan

Southend Development Plan Documents

DPD 2: Planning Obligations

DPD 3: Town Centre Area Action Plan

DPD 4: Seafront Area Action Plan

DPD 5: LondonSouthendAirport Joint Area Action Plan

DPD 6: Criteria Based Policies and Site Allocations

all to be prepared

will replace the remaining policies within the Borough Local Plan once adopted

Plan period to 2021

Southend on Sea Borough Local Plan First Alteration

(Southend on Sea Borough Council)

Alterations relating to detailed guidance for Marine Parade, Leigh on Sea; Houses in Multiple occupation; Gypsy Caravan Site Provision

Adopted October 1997

Plan period to 2001

Southend Development Plan Document (DPD 6): Criteria Based Policies and Site Allocations

(Southend on Sea Borough Council)

to be prepared

Plan period to 2021

Southend on Sea Borough Local Plan Second Alteration (Southend on Sea Borough Council)

Alterations relating to land at Fossetts Farm, Sutton Road, Southend on Sea

Adopted March 1999

Plan period to 2001

Southend Development Plan Document (DPD 6): Criteria Based Policies and Site Allocations

(Southend on Sea Borough Council)

to be prepared

Plan period to 2021

* Land north of Eastern Avenue, Southend and north of Shoebury.


Diagram 2


[1] Sustainable Communities: Building for the Future, Office of the Deputy Prime Minister, February 2003

[2] The Essex Thames Gateway (ETG) broadly encompasses the areas south of the A13 in Thurrock and of the A127 in Basildon, together with the whole of the Boroughs of Castle Point and Southend and London Southend Airport within Rochford District.

[3] The Thames Gateway South Essex Partnership (TGSE) has designated three districts as 'Zones of Change' as the catalyst for the delivery of the vision for a regenerated and sustainable TGSE. The 3 Zones are Thurrock, Basildon and Southend. These are supported by identified 'Zones of Influence', namely Rochford and Castle Point.

[4] London to Southend Movement Study (LOTS) - Hyder Consulting Limited for TGSE Partnership, May 2004

[5] National planning policy guidance: national planning policies are set out in new-style Planning Policy Statements (PPS), which are gradually replacing Planning Policy Guidance Notes (PPG).These are produced by the Office of the Deputy Prime Minister (ODPM) on different aspects of planning and the rules that govern the operation of the system

[11] Draft East of England Plan (Government Office for East of England) – The Secretary of States Proposed Changes to the Draft Revision to the Regional Spatial Strategy December 2006

For instructions on how to use the system and make comments, please see our help guide.